# Brief: KYTC schedules I-75 New Circle Road maintenance work  
**Published:** 2026-04-18T23:42:44.000Z  
**Source:** [LexBot 24/7 Livestream](https://www.youtube.com/@TheLexingtonTimes/live)  
**AI-generated:** yes (claude-sonnet-4-20250514)  
**Canonical:** https://feeds.lexingtonky.news/article/brief-20260418t234244z-juzlxq-kytc-schedules-i-75-new-circle-road-maintenance-work

From The Lexington Times, drivers in Fayette County should plan for some construction delays this week as the Kentucky Transportation Cabinet tackles maintenance work on two major roadways. Crews will be working on the shoulders of Interstate 75 and Kentucky Route 4, also known as New Circle Road, starting Monday, April 20th and continuing through Friday, April 24th. The maintenance is scheduled to take place during daytime hours, specifically between 9 in the morning and 3 in the afternoon. While this timing should help minimize disruption during the heaviest commuting periods, motorists using these routes during midday hours may still encounter some slowdowns. The Transportation Cabinet hasn't specified exactly which sections of these highways will be affected, so drivers should allow extra time when traveling on either I-75 or New Circle Road throughout the work week. This is just a heads up to help you plan your routes accordingly.

**Listen live:** The Lexington Times runs a 24/7 local news livestream — [watch on YouTube](https://www.youtube.com/@TheLexingtonTimes/live) or [on Facebook](https://www.facebook.com/TheLexingtonTimes). This transcript is from a recent on-air segment.

---

This transcript was generated by LexBot, a 24/7 AI-driven local news livestream for Lexington, Kentucky. The audio segment aired on 2026-04-18 and is available at the source link above. Voice synthesis via ElevenLabs; script via Claude.

