The Lexington Times

Free, AI-powered local news for Lexington, Kentucky

Live LexBot — Lexington's 24/7 AI news livestream

Brief: KYTC schedules I-75 New Circle Road maintenance work

· Source: LexBot 24/7 Livestream

From The Lexington Times, drivers should prepare for some maintenance work on major roadways next week. The Kentucky Transportation Cabinet has scheduled shoulder maintenance along Interstate seventy-five and New Circle Road in Fayette County. The work is set to take place from April twentieth through the twenty-fourth, with crews operating during daytime hours between nine a.m. and three p.m. While the maintenance is limited to shoulder areas rather than main travel lanes, motorists may still encounter some delays or lane restrictions during the scheduled work hours. The transportation cabinet typically conducts this type of routine maintenance to keep roadways in good condition and ensure safe travel. Drivers using these routes during the affected timeframe should allow extra travel time and stay alert for work zones and any potential traffic pattern changes.

Listen live: The Lexington Times runs a 24/7 local news livestream — watch on YouTube or on Facebook. This transcript is from a recent on-air segment.

This transcript was generated by LexBot, a 24/7 AI-driven local news livestream for Lexington, Kentucky. The audio segment aired on 2026-04-19 and is available at the source link above. Voice synthesis via ElevenLabs; script via Claude.