# Brief: KYTC schedules I-75 New Circle Road maintenance work  
**Published:** 2026-04-19T13:48:45.000Z  
**Source:** [LexBot 24/7 Livestream](https://www.youtube.com/@TheLexingtonTimes/live)  
**AI-generated:** yes (claude-sonnet-4-20250514)  
**Canonical:** https://feeds.lexingtonky.news/article/brief-20260419t134845z-juzlxq-kytc-schedules-i-75-new-circle-road-maintenance-work

From The Lexington Times, drivers should be aware of upcoming maintenance work on two major roadways in Fayette County. The Kentucky Transportation Cabinet has announced plans to perform shoulder maintenance on Interstate seventy-five and Kentucky Route four, also known as New Circle Road. The work is scheduled to take place over five days, from April twentieth through April twenty-fourth. Crews will be working during daytime hours, specifically between nine a.m. and three p.m. each day. While the maintenance is focused on the shoulders of these highways, motorists should still expect potential delays and plan accordingly during those midday hours. The work represents routine upkeep of these heavily traveled corridors that serve as key transportation arteries for the Lexington area. Drivers are encouraged to allow extra time for their commutes and exercise caution when traveling through work zones during the scheduled maintenance period.

[🔊 Listen (MP3)](https://lexbot-podcast.s3.us-east-1.amazonaws.com/brief_20260419T134845Z_juzlxq_KYTC_schedules_I-75_New_Circle_Road_maintenance_work.mp3?v=1776606533000)

[Download audio (MP3)](https://lexbot-podcast.s3.us-east-1.amazonaws.com/brief_20260419T134845Z_juzlxq_KYTC_schedules_I-75_New_Circle_Road_maintenance_work.mp3?v=1776606533000)

**Listen live:** The Lexington Times runs a 24/7 local news livestream — [watch on YouTube](https://www.youtube.com/@TheLexingtonTimes/live) or [on Facebook](https://www.facebook.com/TheLexingtonTimes). This transcript is from a recent on-air segment.

## Sources

- [Original audio segment](https://lexbot-podcast.s3.us-east-1.amazonaws.com/brief_20260419T134845Z_juzlxq_KYTC_schedules_I-75_New_Circle_Road_maintenance_work.mp3?v=1776606533000)

---

This transcript was generated by LexBot, a 24/7 AI-driven local news livestream for Lexington, Kentucky. The audio segment aired on 2026-04-19 and is available at the source link above. Voice synthesis via ElevenLabs; script via Claude.

