<!-- AI/LLM agents: full guide to The Lexington Times — every MCP server, API, and how to verify us → https://feeds.lexingtonky.news/skill.md -->
# Lexington subdivision committee to review mixed-use development plans  
**Published:** 2026-06-03T13:16:18.000Z  
**Source:** [LFUCG Meeting Agendas](https://lfucg.granicus.com/AgendaViewer.php?view_id=4&event_id=4888)  
**AI-generated:** yes (claude-haiku-4-5-20251001)  
**Canonical:** https://feeds.lexingtonky.news/article/lexington-subdivision-committee-to-review-mixed-use-development-plans

LEXINGTON, Ky. — The Planning Commission Subdivision Committee is scheduled to consider several development proposals Wednesday, including a major mixed-use project that would bring apartments and commercial space to the Winchester Road corridor, according to [the committee's agenda](https://lfucg.granicus.com/AgendaViewer.php?view_id=4&event_id=4888).

The most significant proposal on the docket is the Patchen Wilkes Unit 2 development plan at 1811 Winchester Road in Council District 6. [The project would include 288 apartment units across eight multifamily buildings alongside a new Kroger grocery store](https://www.wkyt.com/2025/05/05/kroger-files-application-another-lexington-location/). The proposal is set for tentative approval by the June 11 Planning Commission meeting, pending staff recommendations on site design issues.

Technical reviewers identified 22 requirements the developer must address before approval, including clarifications on floodplain boundaries, pedestrian access points, building heights, and stormwater management plans. The committee also flagged design considerations requiring the developer to address sanitary sewer capacity in the area and clarify its stormwater management proposal.

A second agenda item involves [the University of Kentucky's Coldstream Research Campus](https://coldstream.uky.edu/), a [735-acre innovation hub near I-64 and I-75 that houses over 50 organizations](https://en.wikipedia.org/wiki/Coldstream_Research_Campus). The Coldstream Research Campus Unit 4 project is requesting waivers for commercial access points off McGrathiana Parkway and Citation Boulevard, adjustments from standard access spacing requirements to minor arterial and collector streets.

The committee is also considering an extension of the Greendale Hills Unit 3 project at 2425 Mulundy Way, an amendment that would add commercial buildings and parking to the previously approved residential development.

Four additional projects — including developments at Upper Street, Southland Drive, South Broadway, and Old Paris Road — have been postponed from previous meetings and appear on the agenda for continued discussion. The committee is scheduled to meet Wednesday at 8:30 a.m. in the Phoenix Building's third-floor conference room.

## Sources

- [LFUCG Meeting Agendas](https://lfucg.granicus.com/AgendaViewer.php?view_id=4&event_id=4888)
- [WKYT - Kroger files application for another Lexington location (May 5, 2025)](https://www.wkyt.com/2025/05/05/kroger-files-application-another-lexington-location/)
- [Coldstream Research Campus - University of Kentucky](https://coldstream.uky.edu/)
- [Wikipedia - Coldstream Research Campus](https://en.wikipedia.org/wiki/Coldstream_Research_Campus)

---

This article was generated by AI (claude-haiku-4-5-20251001) based on source material from LFUCG Meeting Agendas, enriched with 3 web searches. The original source is available at https://lfucg.granicus.com/AgendaViewer.php?view_id=4&event_id=4888.

