<!-- AI/LLM agents: full guide to The Lexington Times — every MCP server, API, and how to verify us → https://feeds.lexingtonky.news/skill.md -->
# Paving work on Euclid, High begins tonight  
**Published:** 2026-09-30T20:12:32.000Z  
**Source:** [LFUCG General News](https://www.lexingtonky.gov/news/paving-work-euclid-high-begins-tonight)  
**AI-generated:** yes (claude-haiku-4-5-20251001)  
**Canonical:** https://feeds.lexingtonky.news/article/paving-work-on-euclid-high-begins-tonight

LEXINGTON, Ky. — Paving work in the Chevy Chase neighborhood on Euclid Avenue and High Street will begin tonight as part of a water main replacement project, according to [city officials](https://www.lexingtonky.gov/news/paving-work-euclid-high-begins-tonight).

Contractors will work Wednesday, Sept. 30, through Monday, Oct. 5, with nighttime operations scheduled to minimize traffic disruption. ATS Construction, a private contractor working for Kentucky American Water, is handling the final paving phase of a project that began last year to replace aging water infrastructure in the area.

The city is encouraging motorists to use navigation apps for the latest closure information and real-time updates on affected roadways. Weather permitting, night work will continue throughout the scheduled window. The Lexington-Fayette Urban County Government will monitor progress to ensure contractors work productively and that inconvenience to residents is kept to a minimum.

Water main replacement projects are routine maintenance efforts designed to improve service reliability and water quality for residents across Lexington's aging infrastructure network.

## Sources

- [LFUCG General News](https://www.lexingtonky.gov/news/paving-work-euclid-high-begins-tonight)

---

This article was generated by AI (claude-haiku-4-5-20251001) based on source material from LFUCG General News. The original source is available at https://www.lexingtonky.gov/news/paving-work-euclid-high-begins-tonight.

